Example 1 · level 1
A can do a piece of work in 10 days and B in 12 days. They work on alternate days, A starting. In how many days is the work finished?
- 10 5/6 days
- 5 5/11 days
- 10 10/11 days
- 11 days
Show solution
- Total work = 60 units; A = 6/day, B = 5/day; a two-day cycle = 11 units.
- 5 full cycles (10 days) do 55 units, leaving 5.
- A works next and the rest is finished on the following day(s): total 10 5/6 days.
Answer: 10 5/6 days